In short
- Voltage dip: voltage below 90% of the declared value for 10 ms – 1 min; below 5% on all phases it is an interruption.
- Dips are mostly caused by short circuits on the HV and MV network, sometimes by motor starts inside the plant.
- Lines stop because contactors drop out, undervoltage releases open and drives trip.
- ARERA pays no compensation for dips: making the plant immune pays off, with the fix chosen by the cost of downtime.
What are voltage dips and short interruptions?
A voltage dip is a temporary reduction of the RMS voltage below 90% of the declared voltage, lasting between 10 ms and 1 minute; if the voltage falls below 5% on all phases it is an interruption instead. These are the definitions of EN 50160 and of ARERA's consolidated text on distribution quality (TIQD 2024-2027), the Italian regulator's rulebook.
"Micro-interruption" (microinterruzione) is not a term of the standard: ARERA uses it for transient interruptions and dips taken together. Watch out for "short interruption" too, whose duration differs between EN 50160 and ARERA.
| Event | Voltage | Duration |
|---|---|---|
| Voltage dip | below 90%, not below 5% on all phases | 10 ms – 1 min |
| Transient interruption (ARERA) | below 5% on all phases | up to 1 s |
| Short interruption | below 5% on all phases | EN 50160: up to 3 min; ARERA: 1 s – 3 min |
| Long interruption | below 5% on all phases | over 3 min |
How are dip depth and duration measured?
With the method of IEC 61000-4-30, which EN 50160 refers to: the RMS value is computed over one cycle (20 ms at 50 Hz) and refreshed every half cycle, i.e. every 10 ms. On this value, Urms(1/2), the standard defines:
- start: at least one phase falls below 90%;
- end and duration: the dip ends when all phases are back above the threshold plus a small hysteresis; the duration is the time between the two instants;
- residual voltage: the lowest RMS value during the event; the depth is 100% minus the residual voltage.
EN 50160 classifies dips by residual voltage and duration; ARERA (TIQD, Table 5) marks on this grid the class 2 and class 3 immunity thresholds of EN 61000-4-11 and 61000-4-34.
| Residual voltage u | 10–200 ms | 200–500 ms | 0.5–1 s | 1–5 s | 5–60 s |
|---|---|---|---|---|---|
| 90 > u ≥ 80% | A1 | A2 | A3 | A4 | A5 |
| 80 > u ≥ 70% | B1 | B2 | B3 | B4 | B5 |
| 70 > u ≥ 40% | C1 | C2 | C3 | C4 | C5 |
| 40 > u ≥ 5% | D1 | D2 | D3 | D4 | D5 |
| u < 5% | X1 | X2 | X3 | X4 | X5 |
In ARERA's statistics (indicator N3b), "severe" dips are MV-origin dips beyond the class 3 threshold and longer than 200 ms: cells A5, B3–B5, C2–C5, D2–D5 and X2–X5. The class 3 threshold in Table 5 of the TIQD also includes D1 and X1, the deepest dips under 200 ms. Cells A3, A4 and C1 exceed only the class 2 threshold.
Where do voltage dips come from?
The typical dip is the footprint of a short circuit, as EN 50160 itself notes. While the fault persists, the voltage collapses near the fault and sags, less and less with electrical distance, across the whole connected network: the duration reflects the protection clearing time, the depth the distance from the fault. That is why an HV fault also hits distant users.
- HV and MV network: lightning, vegetation, insulation failures, digging damage. On Italian MV networks, operated with isolated or compensated neutral, single-phase earth faults generally do not cause dips; phase-to-phase faults do.
- Automatic reclosing: a transient interruption for users on the faulted feeder, a dip for those on neighbouring feeders.
- Inside the plant: direct-on-line motor starts (inrush typically 6–8 times rated current), energisation of transformers and capacitors (dips can be deep, but last no more than 0.5 s), internal faults.
According to ARERA's data from the national monitoring system on primary-substation MV busbars (MonNaLiSA), in 2024 the national average was 3.86 severe dips of MV origin per MV customer, ranging from under 1 to over 14 depending on distributor and region. Dips of HV origin and shallower dips are not counted, yet they can still stop sensitive machines.
Why do machines stop for a dip lasting milliseconds?
Because almost every machine contains a component that reacts within milliseconds and does not reset itself: the dip lasts a tenth of a second, the restart can take hours.
Contactors with AC coils
Catalogue data put the drop-out point at roughly 30–60% of rated coil voltage (IEC 60947-4-1 allows anywhere from 20% to 75%), and one manufacturer states that sags to 20–60% are bridged only for up to 12 ms. When the contactor drops out, its self-holding contact opens too: when the voltage returns, the motor stays stopped.
Undervoltage releases
Under IEC 60947-1 they must open the breaker when the voltage falls to between 70% and 35% of rated voltage: without a time delay, even a short dip can trip the main breaker.
Variable-speed drives
On a 400 V supply the DC link sits at about 540 V (1.35 × 400 V). When the supply sags, the DC link discharges into the motor and the drive trips on undervoltage: in the manuals of two manufacturers, for 400 V units, below roughly 370–375 V, i.e. about 70% of nominal. Single-phase dips are generally less critical, because the rectifier keeps drawing from the other phases.
PLCs and 24 V power supplies
A power supply rides through a sag only for its hold-up time, 35–55 ms at full load in the datasheets of two widely used models; after that the 24 V rail, the PLC I/O and the safety relays drop out.
If it is the RCD that trips, the mechanism is different: see the guide to nuisance tripping of RCDs.
How much should equipment withstand?
No standard requires equipment to ride through any dip: standards set tests at predefined levels and the product standard chooses which ones apply. IEC 61000-4-11 (2020 edition) covers equipment up to 16 A per phase, IEC 61000-4-34 above that, and IEC 61000-6-2 is the generic standard for industrial environments. SEMI F47 and the ITIC curve (formerly CBEMA, drawn up for 120 V IT equipment) often appear in purchase specifications.
| Reference | Residual voltage and duration |
|---|---|
| IEC 61000-4-11 / -4-34, class 2 | 0% for ½ and 1 cycle; 70% for 25 cycles (500 ms); interruption for 250 cycles (5 s) |
| IEC 61000-4-11 / -4-34, class 3 | as class 2, plus 40% for 10 cycles (200 ms) and 80% for 250 cycles (5 s) |
| IEC 61000-6-2 | 0% for 1 cycle (criterion B); 40% for 10 cycles, 70% for 25 cycles, interruption for 250 cycles (criterion C) |
| SEMI F47-0706 | ride through 50% for 200 ms, 70% for 0.5 s, 80% for 1 s |
| ITIC (2000) | operation above: 0% up to 20 ms, 70% up to 0.5 s, 80% up to 10 s, then 90% |
Criterion C allows a temporary loss of function, provided it recovers by itself or through operator action: a machine compliant with the generic standard may stop for a 40% dip lasting 200 ms. Dip ride-through therefore has to be written into the purchase specification.
Example: a three-phase dip to 65% for 120 ms – what rides through?
Equipment compliant with SEMI F47 or tested to class 3 rides through; drives left at factory settings probably do not; AC contactors usually hold, depending on the model.
| Reference or component | What it specifies | Outcome |
|---|---|---|
| EN 50160 / ARERA grid | cell C1 | beyond class 2, within class 3: not "severe" |
| IEC 61000-4-11 / -4-34, class 3 | test at 40% for 200 ms | event milder than the test: equipment passing it without loss of function should ride through |
| IEC 61000-6-2 | 40% for 200 ms, criterion C | may stop and still be compliant |
| SEMI F47 | ride through 50% for 200 ms | keeps running |
| ITIC curve | 70% between 20 ms and 0.5 s | below the curve: not guaranteed |
| Contactor with AC coil | drop-out at about 30–60% (up to 75% under IEC 60947-4-1) | usually holds; drops out if the model's threshold is above 65% |
| Undervoltage release | opens between 70% and 35% | may open if instantaneous; stays closed if delayed |
| Drive without ride-through functions | trip at about 70% of the DC link | trip likely |
| Drive with kinetic buffering | the rotating load feeds the DC link | keeps running if inertia is sufficient |
For ARERA this is a dip the customer's plant should withstand: this is where intervention pays off.
How do you prove what stopped the line?
By recording events at the point of supply with an exact time stamp and comparing them with the production stops and with the distributor's data.
- Measure at the point of supply or on the secondary of the MV/LV transformer, with a synchronised clock, long enough to capture several events.
- Log the time of each stop: PLC alarms, production records, drive fault history.
- Correlate events on the residual voltage–duration plane: the boundary between those that stopped the line and the others is the line's real ride-through curve.
- Measure on several feeders: a dip seen everywhere at the same instant, with no rise in current, points upstream; a dip that is deeper on one feeder, with a current peak, points to an internal cause.
- Compare with the distributor, which records start time to the hundredth of a second, duration, residual voltage and origin of every dip: if the event shows up there too, it came from the grid.
ALADIN is built for this job: it samples voltages and currents at 16 kHz, detects events on the half-cycle RMS value and records their time, duration and residual voltage, plus the current drawn in the second or so before the event, which helps separate grid dips from internal motor starts. The data reaches cloud dashboards and PDF reports; for a multi-point diagnosis there is the power quality audit. For an individual recorder installed by the customer, ARERA requires compliance with EN 50160 and EN 61000-4-30.
From the field
Before counting dips, check two things. An event shorter than half a cycle (10 ms at 50 Hz) is not a dip under EN 50160: it is a transient, to be analysed separately and never added to the dip count. And if the instrument's reference (neutral or measurement earth) is badly connected, the readings wander around the thresholds and create phantom events: check the connections before blaming the grid.
Does the distributor compensate for voltage dips? What ARERA says
No: there is no automatic compensation for voltage dips or transient interruptions. EN 50160 sets no maximum number of dips, only indicative values, and ARERA compensates MV customers solely for long and short interruptions:
- Standard: 6, 9 or 10 unannounced long-plus-short interruptions per year (high, medium and low concentration areas) in 2024-2026, 8 for everyone in 2027.
- Compensation: €2.70 per kW interrupted (customers drawing power) for each interruption above the standard, capped at three times the standard.
- Condition: main switching device and protection meeting ARERA's technical requirements, plus a declaration of adequacy; otherwise no compensation and a specific charge (CTS) of €500 to €3,280.36 a year.
- Courts: claiming further damages in court remains possible, with measurements documenting the event and its link to the damage.
ARERA's principle: customers make their plant immune to dips within class 3 (cells A1–A4, B1, B2 and C1), and the distributor works to reduce the more severe ones.
What to ask the distributor for
- MV customers, by 30 June: long, short and transient interruptions of the previous year, with cause and origin.
- MV customers, by 30 September: the dips recorded on the primary-substation busbar feeding them, event by event.
- New connections: summary data for the previous three years.
- Any customer, at their own cost: an individual recorder managed by the distributor.
How do you make a plant immune to voltage dips?
Start with control circuits and settings, which cost little; keep dip compensators and UPS for lines whose downtime is truly expensive.
| Cost | Measure | What it fixes and limits |
|---|---|---|
| Near zero | Drives: kinetic buffering, automatic restart, flying restart. PLC: restart logic. | The motor slows down and feeds the DC link: one manufacturer quotes a few seconds for fans, 100–200 ms for pumps. |
| Low | Time-delay units for undervoltage releases (catalogue ranges up to about 3 s); delayed or auto-reclosing contactors; DC coils with a capacitor, or electronic coils. | Prevent drop-outs and trips; the emergency stop must remain effective. |
| Low–medium | UPS or buffer modules on the controls: PLC, 24 V, coils, drive electronics. | Often the cheapest option in existing plants; motors remain exposed. |
| Medium–high | Dynamic voltage restorer (DVR) in series with the line. | Corrects within 10 ms drawing energy from the grid itself (one manufacturer: down to 50% residual, for seconds); does not cover interruptions. |
| High | Double-conversion static UPS or flywheel rotary UPS on the whole line. | Covers interruptions too; cost, losses and batteries. |
When the voltage returns, stagger the restarts: motor inrush can reach ten times rated values.
Caution
Delaying an undervoltage release or enabling automatic restart changes the machine's safety behaviour: EN 60204-1 requires automatic restart to be prevented where it could cause a hazard. Every change belongs in the risk assessment, and work on switchboards is for skilled or instructed persons under CEI 11-27 and EN 50110-1.
How much is it worth spending to eliminate stops?
At most, what the avoided downtime is worth:
Expected annual cost = events per year that stop the line × cost of one stop
The number of events comes from correlating measurements with stops, or from the distributor's data; the cost of a stop includes production lost during recovery, scrap, labour, and damage to tools and moulds. Compare it with the annualised investment plus maintenance and losses. With hypothetical figures: 8 stops a year at €5,000 each cost €40,000 a year; if reconfigured drives and a UPS on the controls remove 6 of them, €30,000 a year is saved. Work line by line and measure again after each change.
Frequently asked questions
What is the difference between a voltage dip and undervoltage?
A dip lasts from 10 ms to 1 minute; undervoltage is a low voltage that persists. For LV networks ARERA sets the voltage variation limits at 207–253 V (230 V networks) and 360–440 V (400 V networks).
Why does the drive trip on undervoltage when the lights did not even flicker?
A three-phase dip of a tenth of a second is barely visible on lighting, but it is enough to discharge the DC link below the trip threshold. Kinetic buffering and flying restart solve many cases.
Does a UPS solve everything?
It protects only what it feeds: on control circuits it is the most cost-effective fix; for the motors you need a UPS on the whole line, justified only by expensive downtime.
Sources and standards
- ARERA, TIQD 2024-2027 (resolution 617/2023/R/eel, text updated to 199/2026/R/eel).
- ARERA, voltage quality indicators and severe dips 2024 (in Italian).
- ARERA, consultation 279/2020/R/eel on micro-interruptions.
- e-distribuzione, voltage dip service; e-distribuzione and Confindustria, guide to power supply quality (2018, in Italian).
- EN 50160:2022 + A1:2025 (CEI EN 50160); IEC 61000-4-30 (2015 edition and edition 4.0 of 2025).
- IEC 61000-4-11:2020; IEC 61000-4-34 (2005 + AMD1:2009 + AMD2:2025); IEC 61000-6-2:2016 / EN IEC 61000-6-2:2019.
- SEMI F47-0706 (reapproved 0812); ITI (CBEMA) curve, Information Technology Industry Council, 2000.
- IEC 60947-1; EN 60204-1.
- Manufacturers' documentation: ABB ACS580, Danfoss VLT FCD 302 and Siemens SINAMICS G150 manuals; ABB Softstarter Handbook; ABB Review 2/2015 (PCS100 AVC); ABB and Eaton contactor catalogues; Siemens SITOP PSU8200 and Phoenix Contact QUINT4 datasheets.