In short
- EN 50160 describes the voltage at the supply terminals of public networks: it is not an equipment immunity or emission standard.
- Its limits are statistical: they apply to the 10-minute mean values of each week, not to individual peaks.
- For voltage dips, swells and interruptions the standard gives only classification tables and indicative values.
- In Italy, for the voltage magnitude at LV, ARERA imposes 207–253 V with no statistical allowance.
- Check the measurement and your own installation first; then ask the distributor for a voltage check, which costs €150 only if the voltage turns out to be within limits.
What is EN 50160 and what is it for?
EN 50160 defines the characteristics of the voltage a user can expect at the supply terminals of public low, medium, high and extra-high voltage networks under normal operating conditions: frequency, magnitude, waveform and the symmetry of the three phases. It describes what the network delivers, not what equipment must withstand.
The current edition is EN 50160:2022 with amendment A1:2025, which concerns harmonics at HV and EHV. It replaced the 2010 edition, finally withdrawn on 7 November 2025. In Italy it is published as CEI EN 50160 (CEI classification 8-9); the Italian-language edition with amendment A1 dates from August 2025. Compared with the 2010 edition it adds extra-high voltage, clarifies dips and swells, and updates the LV values for the 15th and 21st harmonics.
What the standard is not
- Not an immunity or emission standard: its values are neither electromagnetic compatibility levels nor product limits.
- Not applicable inside a factory: industrial networks are excluded from its scope; for compatibility levels in internal networks the reference is IEC 61000-2-4.
- Not applicable under abnormal conditions: faults, works, exceptional events, and user installations that do not comply with the connection rules, including the limits on disturbance emissions.
In Italy the standard has regulatory force: Article 50 of ARERA's integrated text on distribution quality (TIQD) applies its latest edition to MV and LV distribution networks, except for interruptions, frequency and the LV voltage magnitude, which are regulated separately.
What are the EN 50160 limits at low and medium voltage?
Requirements for LV (nominal voltage Un, 230/400 V in Italy) and MV (declared voltage Uc). Unless stated otherwise, they apply to the 10-minute mean values over one week.
| Parameter | Low voltage (LV) | Medium voltage (MV) |
|---|---|---|
| Frequency (10 s mean, interconnected systems) | 50 Hz ±1% (49.5–50.5 Hz) for 99.5% of a year; 47–52 Hz for 100% of the time | As LV |
| Supply voltage variations | 95% of values within Un ±10%; all within Un +10%/−15% | 99% of values within Uc ±10%; all within Uc ±15% |
| Rapid voltage changes | Indicative: generally up to 5% of Un, occasionally up to 10% | Indicative: generally up to 4% of Uc, occasionally up to 6% |
| Flicker (Plt) | Plt ≤ 1 for 95% of the week | As LV |
| Unbalance (negative over positive sequence) | ≤ 2% for 95% of values; up to about 3% where single- and two-phase connections prevail | ≤ 2% for 95% of values |
| Voltage THD (up to order 40) | ≤ 8% for 95% of values | As LV |
| Individual harmonics (up to order 25) | Values per order, for 95% of values | As LV, except 15th and 21st |
| Interharmonics | No limit values | No limit values |
| Mains signalling voltages | 3 s mean within the standard's curve for 99% of a day | As LV |
| Dips and swells | Classification and indicative values only | As LV |
| Short (up to 3 min) and long interruptions | Voltage below 5% on all phases; indicative values only | As LV |
Harmonics: values for each order
At LV, for 95% of the week's values, each harmonic, as a percentage of the fundamental, must not exceed:
- odd, not multiples of 3: 5th 6%, 7th 5%, 11th 3.5%, 13th 3%, 17th 2%, 19th, 23rd and 25th 1.5%;
- multiples of 3: 3rd 5%, 9th 1.5%; for the 15th and 21st the values updated in 2019 apply, see the standard;
- even: 2nd 2%, 4th 1%, 6th to 24th 0.5%.
No values are given above order 25, because high-order harmonics depend on local resonances. Causes and remedies are covered in the guide to harmonics in industrial installations.
Dips, swells and interruptions: classification only
A voltage dip starts below 90% of the reference voltage and lasts from 10 ms to 1 minute; a swell starts above 110%; an interruption is a voltage below 5% on all phases. The standard sets no maximum number of events, only how to classify them: for dips, five residual-voltage bands (90–80%, 80–70%, 70–40%, 40–5%, below 5%) against five durations (10–200 ms, 0.2–0.5 s, 0.5–1 s, 1–5 s, 5–60 s); for swells, two bands (110–120% and 120% or more) against three durations (10–500 ms, 0.5–5 s, 5–60 s). How to compare this with machine immunity is explained in the guide to voltage dips.
How is EN 50160 compliance measured?
EN 50160 refers to EN 61000-4-30 for measurement methods; choosing the instrument and measurement points and setting up the campaign are covered in the guide to power quality analysis. The current edition is IEC 61000-4-30 Ed. 4.0 (October 2025), adopted as EN IEC 61000-4-30:2025, which updates the methods for rapid voltage changes and voltage events. In outline:
- A basic 10-cycle window (about 200 ms at 50 Hz), aggregated into 3 s, 10-minute and 2-hour values. The 10-minute values are compared with the limits; frequency uses 10 s means and flicker Plt uses 2-hour blocks.
- Events detected on the one-cycle RMS value refreshed every half cycle, so that even 10 ms dips are captured.
- Flagging: intervals containing a dip, swell or interruption are excluded from the voltage, harmonic and unbalance statistics, so a network fault is not counted twice.
- Duration: at least one full week, i.e. 1,008 ten-minute intervals.
Class A (advanced) is used when results must be comparable and defensible, for example in a dispute; Class S (surveys) uses the same intervals with less stringent requirements, for surveys and diagnostics. Measure at the supply terminals, which do not always coincide with the meter; on four-wire LV supplies the phase-to-neutral voltages count.
Caution
Connecting an instrument in a live switchboard is electrical work: it must be done by skilled or instructed persons under CEI 11-27 and EN 50110-1, with protected voltage circuits and an instrument whose measurement category suits the installation point.
How do you read an EN 50160 compliance report?
A report sums up a week as one result per parameter: check how much data is valid, which statistic is compared with which limit, and which parameters are missing. An illustrative example for a 230/400 V LV supply:
| Parameter | Limit | Result | Outcome |
|---|---|---|---|
| Valid intervals | — | 1,002 of 1,008 (6 flagged by voltage events) | — |
| Voltage L1 / L2 / L3 | At least 95% within 207–253 V; all within 195.5–253 V | 99.6% / 99.8% / 94.1%; minimum 201 V on L3 | L3 non-compliant |
| Unbalance | 95th percentile ≤ 2% | 0.7% | Compliant |
| Voltage THD | 95th percentile ≤ 8% | 3.4% | Compliant |
| 5th harmonic | 95th percentile ≤ 6% | 2.9% | Compliant |
| Frequency | 99.5% within 49.5–50.5 Hz | 100% | Compliant |
| Flicker Plt | 95th percentile ≤ 1 | Not measured | Not assessed |
- Percentiles. For parameters with only an upper limit, the 95th percentile counts: the value below which 95% of the valid intervals fall. For voltage, the share of intervals inside the band counts, plus the minimum and maximum.
- The real margin. The 5% allowed at LV is about 50 intervals, just over 8 hours a week; the 1% at MV is about 10 intervals.
- Gaps. Many flagged intervals or days without data make the week unrepresentative; without flicker the overall result is incomplete.
- The Italian reference. L3 fails the standard (94.1%); in the ARERA check it would fail on the 201 V minimum alone.
Is the voltage out of limits because of the network or my installation?
You find out by measuring at the supply terminals and on internal feeders at the same time: if the problem is already there at the supply terminals, even with the plant shut down, it comes from the network; if it appears only downstream, or only when certain machines run, it originates in the installation.
- Undervoltage. If the voltage is normal at the supply terminals and falls along the feeders under load, it is an internal voltage drop: for a three-phase line ΔU ≈ √3 · I · L · (R·cosφ + X·sinφ). The fix is cable size, load distribution or power factor correction, not a complaint.
- MV customers. If the voltage is wrong across the whole site but the MV side is normal, check the off-load tap setting of your own MV/LV transformer.
- Harmonics. If voltage THD rises when inverters and drives are running, the distortion is largely yours; if it is already there with the plant off (nights, holidays), it comes from the network.
- Unbalance. If voltage unbalance follows your current unbalance (single-phase loads concentrated on one phase), the cause is internal.
- Dips. If your current jumps at the start of the dip (a large motor starting, a transformer being energised), the cause is almost always internal; with no current spike, the dip usually comes from the network.
Formally, too, EN 50160 does not cover installations that breach the connection rules (CEI 0-16 at MV and HV, CEI 0-21 at LV in Italy).
From the field
Before blaming the network, check the measurement. A loose or floating neutral or voltage reference on the instrument makes the measured voltages wander, often one phase up and another down, and the recorder logs dips and swells that do not exist on the network: they vanish as soon as the connection is fixed. Compare the voltages with a multimeter on the same terminals and be suspicious of opposite-sign events on different phases. If the pattern persists, the loose neutral may be in the installation itself: a dangerous fault to have checked straight away.
Voltage out of limits: what to do in Italy?
Once the measurement and the installation are ruled out, ask the distributor for the supply voltage check (verifica della tensione di fornitura) provided for by ARERA: free if the voltage is found out of limits, €150 if it is within limits.
- Collect data: at least one week of 10-minute values at the supply terminals, with the date and time of any problems.
- Submit the request: LV customers through their electricity supplier, which must forward it to the distributor within 2 working days; MV customers directly to the distributor or through a supplier holding a mandate; generators directly to the distributor.
- Wait for the outcome: within 20 working days of the confirmed request. The distributor typically installs a CEI EN 61000-4-30 recorder at the supply terminals; in the case decided by ARERA resolution 325/2026/E/eel it recorded for one week.
- Restoration: if the voltage is out of limits, the standard is 50 working days; if it is missed, an automatic compensation applies, with a base of €40.25 (LV domestic), €80.50 (LV non-domestic) or €161 (MV), doubling or tripling with the delay.
Which limits. The check verifies the limits in Title 6 of the TIQD: at LV 207–253 V for 230 V supplies and 360–440 V between phases for 400 V supplies. In its rulings on complaints 241/2025/E/eel and 325/2026/E/eel, ARERA confirmed that the 207–253 V limits apply "without further specifications or tolerance margins": the 95% statistical criterion of CEI EN 50160 does not apply to the check, and even a few 10-minute values outside the limits make it non-compliant. At MV, and for harmonics and unbalance, the reference remains CEI EN 50160; for frequency the TIQD refers to CEI 0-16 and the grid code.
Other tools. On request and at the user's expense, the distributor must install an individual voltage quality recorder compliant with CEI EN 50160 and CEI EN 61000-4-30. Since 2025, MV users receive by 30 September the dips recorded in the previous year on the primary-substation MV busbar that supplies them; in 2024 the national average published by ARERA was 3.86 "severe" dips per MV user.
Is one week of measurement enough, or do you need continuous monitoring?
A week tells you whether that week was compliant, not whether the supply is: the voltage changes with the seasons, production and network configuration.
- Seasons: at LV, photovoltaic generation raises the voltage around midday on sunny days; this is why, in the case examined by ARERA, the check was carried out in May.
- Production and network: shifts, shutdowns, new lines and network reconfigurations change currents and impedances.
- Events: dips and interruptions are counted per year; a week without events says nothing about the rest of the year.
With ALADIN the voltage is sampled at 16 kHz per channel, processed in 200 ms (10-cycle) windows and aggregated into 10-minute values for the EN 50160 assessment; every event is logged with time, duration and residual voltage, together with the current drawn just before it, and the automated reports include an EN 50160 compliance view alongside THD, unbalance and frequency. It does not replace the distributor's check, but it tells you when to request one and with what evidence; for targeted measurement campaigns there is the Power Quality service.
Frequently asked questions
Is EN 50160 mandatory for the distributor?
Like any technical standard it is voluntary, but in Italy ARERA's TIQD makes it binding for MV and LV networks, with the exceptions described above. A contract between the user and the distributor can set different terms.
What are the minimum and maximum low-voltage values?
207 V and 253 V for 230 V supplies; 360 V and 440 V between phases for 400 V supplies. The standard on its own would tolerate 5% of the week's values outside ±10%, down to −15%; Italian regulation does not.
Can I dispute the voltage with my own instrument's measurements?
They support the request and help choose the period to check; the distributor's check is what counts. The TIQD requires a user's own recorder to comply with CEI EN 50160 and CEI EN 61000-4-30 as well.
Sources and standards
- CENELEC, EN 50160:2022 + A1:2025, Voltage characteristics of electricity supplied by public electricity networks; amendments EN 50160:2010/A2:2019 and A3:2019.
- CEI EN 50160 (CEI 8-9) and CEI EN 50160/A1, CEI technical committee CT 8/123 catalogue.
- IEC 61000-4-30:2025 Ed. 4.0, Power quality measurement methods.
- ARERA, TIQD, Annex A to resolution 617/2023/R/eel, Title 6.
- ARERA, TIQC, Annex B to resolution 617/2023/R/eel, Articles 1, 9, 26 and Table 1.
- ARERA, resolution 325/2026/E/eel, referring to resolution 241/2025/E/eel.
- ARERA, voltage quality indicators in distribution networks, 2024.
- European Copper Institute, Application Note Cu0147, Standard EN 50160 (2013).
- IEC 61000-2-4:2024; CEI 0-16; CEI 0-21; CEI 11-27; EN 50110-1.