In short
- The charges apply to non-domestic customers on medium voltage (MV) and on low voltage (LV) with more than 16.5 kW of available power.
- In bands F1 and F2 you pay for every kvarh above 33% of the kWh in the same band: a monthly average power factor below about 0.95.
- Since 1 April 2023 every capacitive kvarh fed into the grid in F3 is also charged, typically from capacitors left connected while the plant is idle.
- Since 2024 there is a single rate: in 2026 it is 0.377 c€/kvarh on MV and 1.088 c€/kvarh on LV.
- Correction is sized with Qc = P·(tanφ₁ − tanφ₂), then checked against harmonics and minimum load.
What is reactive energy and what does cos φ tell you?
Reactive energy is what motors, transformers and other inductive loads exchange with the grid to build their magnetic fields. It does no useful work, but it makes current flow through cables, transformers and the distribution network. It is measured in kvar (power) and kvarh (energy).
Cos φ is the cosine of the phase angle between voltage and current and tells you how much of the apparent power S (kVA) is active power P (kW): S² = P² + Q², cos φ = P/S, tan φ = Q/P. At cos φ 0.78 you need about 256 kVA to deliver 200 kW; at cos φ 0.97, 206 kVA is enough.
Power factor correction means generating the reactive power the loads need on site, with capacitors or electronic devices. For the same active power, current falls with apparent power and Joule losses with its square: in the example, upstream of the correction point, current drops by about 19% and conductor losses by about 35%.
With distorted currents the power factor (P/S on the full waveforms) is lower than the cos φ of the 50 Hz fundamental alone. Capacitors correct displacement, not distortion: if the power factor stays low after correction, the cause is harmonics.
Who pays for reactive energy on the bill, and above which thresholds?
The Italian distribution tariff code (TIT 2024-2027, Annex A to ARERA decision 616/2023/R/eel, art. 32) applies the charges to non-domestic customers connected at medium voltage and to non-domestic low-voltage customers with more than 16.5 kW of available power. Households and LV supplies up to 16.5 kW are excluded; high and extra-high voltage follow separate rules (decision 712/2022/R/eel). The 2026 rules (Table 5 of the TIT):
| Reactive energy exchange | What is charged | MV 2026 | LV above 16.5 kW 2026 |
|---|---|---|---|
| Drawn in F1 and in F2 | Monthly kvarh above 33% of the kWh in the same band (cos φ below about 0.95) | 0.377 c€/kvarh | 1.088 c€/kvarh |
| Drawn in F3 | Nothing | — | — |
| Fed in (capacitive) in F3 | Every kvarh, no allowance | 0.377 c€/kvarh | 1.088 c€/kvarh |
| Fed in during F1 and F2 | No charge, but feeding in is not permitted (art. 31.3) | — | — |
ARERA time bands: F1 Monday to Friday 08:00–19:00; F2 Monday to Friday 07:00–08:00 and 19:00–23:00, Saturday 07:00–23:00; F3 Monday to Saturday 23:00–07:00, plus all day on Sundays and public holidays.
Many guides still describe two tiers, between 33% and 75% of active energy and above 75% (cos φ below 0.8): that structure applied from 2016 (decision 180/2013/R/eel). From 1 January 2024 ARERA replaced it with a single rate per voltage level, set at the average of the old tiers, with no allowance beyond the 33% threshold on drawn energy. Rates are updated every year: in 2025 they were 0.361 c€/kvarh on MV and 1.046 on LV.
The TIT also sets technical limits (art. 31): instantaneous power factor of at least 0.9 at maximum load in F1 and F2, monthly average of at least 0.7, and no reactive energy fed into the grid. If they are not met, the distributor can require the installation to be upgraded, under threat of suspending the supply.
Why is capacitive reactive energy charged too?
Because since 1 April 2023, under decision 232/2022/R/eel, reactive energy fed into the grid in F3 by non-domestic MV customers and LV customers above 16.5 kW carries a charge, now equal to the one for excess consumption. ARERA has recorded growing reactive flows from distribution networks, concentrated in low-load hours and affecting voltage control. The typical cause named in the decision is capacitors that stay connected when the plant draws little reactive power; the remedy is to switch them off when the plant is idle.
For scale: a 100 kvar fixed bank left on with almost no load for the roughly 310 F3 hours in a month can feed in up to 31,000 kvarh, about €117 a month on MV or €340 on LV at 2026 rates. On LV the charge is zero if the meter cannot record fed-in reactive energy by band (art. 32.7).
How do you read the kvarh on the bill and work out cos φ?
The charge belongs to the distribution tariff. On LV bills in the ARERA format in force since 1 July 2025 (decision 315/2024/R/com), it has its own line within the consumption charges, under network costs, in kvarh and euro/kvarh; the bill also shows the reactive-to-active ratio and the monthly power factor. For MV customers ARERA does not regulate the invoice format. For an analysis you need the full readings per band (kWh and kvarh drawn in F1, F2 and F3 and kvarh fed in during F3); ask the supplier if they are not on the bill. MV customers also get fed-in reactive data from the distributor. For each band:
- average tan φ = kvarh / kWh;
- average cos φ = kWh / √(kWh² + kvarh²);
- kvarh charged = kvarh − 0.33 × kWh, if positive.
Example. An MV plant reads in one month: F1 48,000 kWh and 38,400 kvarh; F2 16,000 kWh and 12,000 kvarh. In F1 tan φ = 0.80 (cos φ 0.78) and the excess is 38,400 − 0.33 × 48,000 = 22,560 kvarh; in F2 tan φ = 0.75 (cos φ 0.80) and the excess is 12,000 − 5,280 = 6,720 kvarh. Total 29,280 kvarh: about €110 a month at 0.377 c€/kvarh, or about €319 if the supply were LV.
| kvarh/kWh | Average cos φ | Effect in F1 and F2 |
|---|---|---|
| 1.02 | 0.70 | At the technical limit for the monthly average |
| 0.75 | 0.80 | About 56% of the kvarh drawn is charged |
| 0.48 | 0.90 | About 32% of the kvarh drawn is charged |
| 0.33 | 0.95 | Threshold: no charge |
| 0.25 | 0.97 | Margin below the threshold |
| 0 | 1.00 | No margin before going capacitive when load drops |
On MV the cost per kvarh is modest: often the bigger benefit of correction is lower current, losses and voltage drop. The charges are still a useful monthly signal that something is not working.
How do you calculate the correction you need?
The capacity to install is Qc = P · (tanφ₁ − tanφ₂), where P is the active power to correct, φ₁ the present angle and φ₂ the target. Aim for a cos φ between 0.96 and 0.98 rather than exactly 0.95: what counts is the monthly average per band, which includes motor starts, late steps and load swings.
Example. With the data above, F1 (22 days × 11 hours = 242 hours) gives an average power of 48,000 / 242 ≈ 200 kW, with tan φ₁ = 0.80. To reach cos φ₂ = 0.97 (tan φ₂ = 0.25): Qc = 200 × (0.80 − 0.25) ≈ 110 kvar. Stopping at 0.95 (tan φ₂ = 0.33) would need about 94 kvar. A consistent choice is an automatic bank of about 120 kvar in 10 or 20 kvar steps, so the controller follows the load without overshooting its setpoint.
The monthly average is only a starting point: you need the real load profile (P and Q at short intervals over one or two weeks), with peaks, the minimum load at night and at weekends, and harmonics. Minimum load sets how much correction can stay permanently connected.
From the field
Before sizing a bank from a measurement, make sure the measurement is right. A wiring error raises no alarm: voltages and currents look normal, but the angle is shifted. A current transformer (CT) on the wrong phase shifts it by 120°, two voltage transformers (VTs) swapped in an ARON two-wattmeter connection by 60°, a reversed CT by 180°. The result is phases that look capacitive, negative active power, reactive energy that does not match the bill: we have come across readings like these, and the cause was the wiring, not the installation. Check phase rotation, the pairing and orientation of every CT, positive active power on each phase, and compare kWh and kvarh with the utility meter over the same period.
Which correction should you choose: fixed, automatic, at the motor, static or active?
It depends on how the load varies and how much harmonic distortion there is.
| Solution | Where it works well | Limits and cautions |
|---|---|---|
| Fixed, on the transformer | Magnetising reactive power of a transformer that is always energised | No more than the reactive power drawn at minimum load |
| At the motor | Large fixed-speed motors that run for long hours | No more than 90% of no-load reactive power (self-excitation, overvoltage on disconnection); never on a drive output |
| Automatic stepped bank | Most plants with a varying load | Contactors and capacitors wear out: maintenance is needed |
| Automatic with detuning reactors | Plants with drives, rectifiers, welders, induction furnaces | Costs more; protects the capacitors but does not reduce harmonics |
| Static, thyristor-switched | Fast loads such as welders, presses and robots: switching in about 60 ms, without switching transients | Higher cost |
| Active (active filters, electronic compensators) | Heavily distorted plants or loads that swing between inductive and capacitive: continuous control in both directions, plus filtering and balancing | Highest cost; sized on reactive and harmonic current |
A mix often works best: a small fixed share for the transformer, the largest motors corrected individually, and an automatic bank (detuned if needed) for the rest. With photovoltaics the grid supplies fewer kWh but the same reactive power, so the controller needs a higher setpoint and must measure at a point that also sees the PV output.
Which mistakes bring the charges back or damage the installation?
Harmonics and parallel resonance
Capacitors and transformer form a resonant circuit at harmonic order h ≈ √(Ssc/Qc), where Ssc ≈ Sn/uk when the transformer dominates. With 1000 kVA and uk 6%, ignoring the upstream network, 300 kvar puts the resonance near the 7th harmonic (h ≈ 7.5) and 500 kvar near the 5th (h ≈ 5.8): exactly the harmonics produced by drives and rectifiers. Harmonic currents are amplified: overheated or bulging capacitors, blown fuses, rising voltage distortion. Since the resonance moves with every step, the problem may appear only with certain combinations.
The usual remedy is detuning reactors: a reactor in series with each step places the tuning frequency fD below the lowest harmonic, typically 180–190 Hz (p = 7% gives 189 Hz) and 135–140 Hz in the most disturbed plants. With fD = 50 Hz / √p, capacitor voltage rises to U / (1 − p) and calls for capacitors with a higher rated voltage. The harmonics remain: reducing them takes filters. Before choosing, measure THD with and without the bank connected.
Over-correction
An oversized bank, or a controller set to cos φ 1, makes the installation capacitive as soon as load drops: every kvarh fed in during F3 is charged and voltage rises. Common causes: a smallest step that is too large for the night-time load, long switch-off delays, steps left in manual mode.
Fixed capacitors on transformers at no load
A fixed capacitor sized for the transformer at full load feeds reactive power into the grid when the transformer stays energised at no load, at night or during holidays. At no load it draws only its magnetising reactive power, roughly the no-load current percentage times the rating: for a 630 kVA unit with 1.8% no-load current, about 11 kvar.
Failed steps that nobody notices
Blown fuses, contactors that no longer close, capacitors losing capacitance as they age: the controller works with what is left until the average cos φ falls below 0.95 and the charges come back, sometimes months later. In detuned banks, lost capacitance also pushes the tuning frequency up towards the 5th harmonic. The opposite case is a contactor with welded contacts: a step stays permanently connected and produces capacitive energy in F3.
Caution
Capacitors stay charged after disconnection: EN 60831-1 requires discharge devices that bring the voltage to 75 V or less within 3 minutes. Inspections, fuse replacement and measurements in correction panels are electrical work for skilled or instructed persons under CEI 11-27 and EN 50110-1, with discharge and short-circuiting verified before touching anything.
Why monitor power factor and reactive energy feeder by feeder?
Because the bill arrives late and only shows the monthly total. Continuous measurement of active and reactive power, power factor and THD on the correction feeder and the main outgoing feeders shows at once:
- a step that no longer switches in: at the same load, reactive power drawn from the grid rises in steps;
- correction left on while the plant is idle: at night active power is close to zero while reactive power stays at the bank rating;
- resonance building up: current THD rises when certain steps switch in;
- which departments draw the reactive power, to decide where to correct locally.
Compare with the bill over the same intervals, remembering that with distorted currents different instruments may define reactive power differently. ALADIN measures per-phase voltage, current, power factor, active and reactive power and energy (telling inductive from capacitive reactive), and THD, over 200 ms windows sampled at 16 kHz, with cloud dashboards and automated reports: on the correction feeder or the main incomer it shows the effect of correction, capacitive reactive fed back while the plant is idle, and any drift before the bill does. For several feeders there is energy monitoring; to size or review correction from data, energy consulting. Choosing measurement points and building indicators is covered in the guide to industrial energy monitoring; proving the result of a project, in the guide to IPMVP.
Frequently asked questions
How much does a kvarh of reactive energy cost in 2026?
0.377 c€/kvarh on medium voltage and 1.088 c€/kvarh on low voltage above 16.5 kW, both for excess consumption in F1 and F2 and for energy fed in during F3. ARERA updates the rates every year; for 2026 with decision 575/2025/R/eel.
Does the 0.95 threshold apply to the instantaneous value or the average?
To the monthly average for each band, that is the ratio of kvarh to kWh. Short periods below 0.95 cost nothing if the average stays above; the technical limit of 0.9 on the instantaneous value at maximum load still applies.
How do you check that a correction bank actually works?
Compare the current of each step with its rated value, Q/(√3·U): for 20 kvar at 400 V, about 29 A per phase. A step drawing much less has fuses or capacitors to check. Checks are work for skilled or instructed persons.
Sources and standards
- ARERA, decision 616/2023/R/eel, Annex A (TIT 2024-2027, text in force from 1 July 2025), arts. 31-34, and TIT tables in force from 1 January 2026, Table 5: arera.it
- ARERA, decision 616/2023/R/eel, Annex D, technical report, ch. 6: arera.it
- ARERA, decision 575/2025/R/eel, 2026 update of distribution tariffs: arera.it
- ARERA, decision 232/2022/R/eel, reactive energy on medium- and low-voltage networks: arera.it
- ARERA, decision 180/2013/R/eel, reactive energy drawn at MV and LV from 2016: arera.it
- ARERA, decision 350/2026/R/eel, which refers to 712/2022/R/eel on high and extra-high voltage: arera.it
- ARERA, decision 315/2024/R/com, Annex A: LV bill transparency rules from 1 July 2025 (in Italian): arera.it
- ABB, Technical Application Paper No. 8, power factor correction and harmonic filtering in electrical plants (Italian edition): abb.com
- ORTEA Next (Icar, Ortea), power factor correction catalogue CT-ICARPFC 2025.
- EN 60831-1, IEC 61642, CEI 11-27, EN 50110-1.