In short
- Voltage fluctuations of a few tenths of a percent are enough to make lights flicker if they repeat.
- Flicker can only be measured with an IEC 61000-4-15 flickermeter: Pst over 10 minutes, Plt over 2 hours; Pst = 1 is the conventional annoyance threshold.
- What matters is the size of the load's power swings compared with the short-circuit power of the network.
- In Italy the distributor sets the disturbance a user may inject when it connects (CEI 0-16, CEI 0-21).
- Act on the load first; network reinforcement and dynamic compensators only where they are really needed.
What is flicker and why do lights flicker?
Flicker is the impression of unsteady vision caused by a light whose intensity, or spectrum, varies over time (IEC 60050-161, also used in CEI 0-16). On electrical networks it comes from voltage fluctuations: a series of changes in the RMS voltage, or a cyclic variation of its envelope, which lamps turn into variations of light. It is one of the power quality disturbances.
How annoying it is depends on the size and the frequency of the changes: the standard flickermeter weights them with a filter that reproduces the lamp–eye–brain chain, centred around 8.8 Hz. According to the Canadian Centre for Occupational Health and Safety (CCOHS), changes of a few tenths of a percent can produce very annoying flicker, especially when they are regular and repeat between 5 and 15 Hz, even with the voltage comfortably inside its magnitude limits.
The reference lamp and LEDs
The indices and limits are based on a 60 W, 230 V incandescent lamp. IEC TR 61547-1 (2020) acknowledges that current lighting technologies are generally less sensitive to voltage fluctuations, though sometimes more, and keeps that reference for now. It also defines an "optical" light flickermeter (index PstLM), which EU Regulation 2019/2020 caps at 1.0 for mains-powered LED light sources: a requirement on the lamp, not on the network.
How is flicker measured: what are Pst and Plt?
With a flickermeter compliant with IEC 61000-4-15 (2010 edition), which derives two severity indices from the voltage waveform:
- Pst, short-term severity over 10 minutes. It is scaled so that at Pst ≥ 1 half of observers notice the flicker and may find it annoying.
- Plt, long-term severity over 2 hours: the cubic mean of 12 consecutive values, Plt = ∛(Σ Pst,i³ / 12), which gives more weight to the high ones.
The instrument filters the voltage envelope between 0.05 and 35 Hz, weights it like the lamp–eye–brain chain and classifies the instantaneous flicker sensation statistically; Pst combines the levels exceeded for 0.1, 1, 3, 10 and 50% of the time:
Pst = √(0.0314·P0.1 + 0.0525·P1s + 0.0657·P3s + 0.28·P10s + 0.08·P50s)
Voltage changes and rapid voltage changes
Product standards also use the "d" parameters, computed from the RMS value of each half cycle: dc, the largest change between two steady states; dmax, the largest absolute change; Tmax, the time spent beyond the dc limit.
IEC 61000-4-30 defines a rapid voltage change (RVC) as a quick transition of the RMS voltage between two steady states that does not cross the dip or swell thresholds; Edition 4.0 (2025) corrected and extended its measurement method. If the voltage falls below 90%, the event is a voltage dip instead.
Which instrument you need
Pst requires continuous processing of the waveform and cannot be derived from RMS values aggregated over 200 ms or 10 minutes. Class A analysers under IEC 61000-4-30 include flicker by reference to IEC 61000-4-15; for any other instrument, check the datasheet.
Which flicker limits apply?
It depends on what is being assessed: the network voltage, the emission of a single appliance, or the planning of connections.
| Reference | Applies to | Values |
|---|---|---|
| EN 50160:2022 + A1:2025 | Voltage at the supply terminals of public LV and MV networks (binding in Italy through ARERA's TIQD) | Plt ≤ 1 for 95% of every week |
| IEC 61000-2-2 | Compatibility level of public LV networks | Pst = 1 |
| IEC TR 61000-3-7:2008 | Indicative planning levels used by the distributor | MV: Pst 0.9, Plt 0.7; HV and EHV: Pst 0.8, Plt 0.6 |
| IEC 61000-3-3 (2013 + AMD1:2017 + AMD2:2021) | Equipment up to 16 A per phase, not subject to conditional connection | Pst ≤ 1; Plt ≤ 0.65; dc ≤ 3.3%; dmax ≤ 4% (6% or 7% in the cases the standard allows); Tmax ≤ 500 ms |
| IEC 61000-3-11:2017 | Equipment from 16 to 75 A per phase, or that fails 3-3, subject to conditional connection | Same limits, met with a maximum system impedance declared by the manufacturer or a minimum service current capacity |
The EN 50160 values are not emission limits, and the standard itself notes that the reaction to flicker is subjective. For single rapid voltage changes it gives indicative values only (Annex B in the 2022 edition), listed in our guide to EN 50160.
IEC 61000-3-3 tests use a reference impedance (0.24 + j0.15 Ω on the phase, 0.16 + j0.10 Ω on the neutral) and the limits apply at the boundary with the public network: inside a factory, where impedances are higher, even a compliant appliance can make the lights flicker.
Connection rules in Italy
Under CEI 0-16 (HV and MV) and CEI 0-21 (LV), the distributor states the maximum disturbance a user may inject, flicker included, based on the margin available in that part of the network.
- Assessment: following IEC TR 61000-3-7, so that the levels of EN 61000-2-12 on MV and of the national Grid Code on HV are not exceeded. The connection contract states the maximum flicker severity index of the network.
- Rapid voltage changes on MV: informative Annex F of CEI 0-16 gives the short-circuit power expected for each level of available power, assuming a 5% limit on rapid voltage changes (30 MVA for 630 kW, 54 MVA for 3,000 kW). If changes above 5% are later recorded, the operator installs a recorder of current peaks at the user's premises.
- Generators: CEI 0-21 requires inverters to be tested to EN 61000-3-3 or 61000-3-11; CEI 0-16 requires flicker measurements on static and wind generators to IEC 61400-21.
Which loads cause flicker?
Loads whose demand, reactive power in particular, changes quickly and repeatedly, with a power that is not negligible compared with the short-circuit power Ssc of the network. The relative voltage change can be estimated as follows (IEEE 1453, IEC TR 61000-3-7):
d ≈ (R·ΔP + X·ΔQ) / U² or, more roughly, d ≈ ΔS / Ssc
R and X are the network resistance and reactance seen from the load; ΔP, ΔQ and ΔS are the changes in active, reactive and apparent power. The second formula is conservative and works best when the change is mostly reactive (motor starts, arc furnaces) and the network has a high X/R ratio.
CEI 0-16 lists flicker among the disturbances produced by:
- arc furnaces, the toughest case, because the power drawn by the arc varies continuously;
- resistance and arc welders; resistance welders are also listed as a source of unbalance;
- induction motors, for example on compressors, started direct-on-line and often: inrush is typically 6–8 times rated current;
- variable-speed motors and wind generators; the output of large PV plants also changes as clouds pass.
Less obvious are interharmonics, components at frequencies that are not multiples of 50 Hz, produced by frequency converters, induction furnaces and welders: EN 50160 warns that they can cause flicker even at low levels, and IEC 61000-2-2 gives them a dedicated compatibility curve. See our guide to harmonics in industrial plants.
What does flicker do to people, equipment and neighbours?
- People: CCOHS lists blurred vision, eye strain, fatigue and headaches; IEC TR 61547-1 mentions reduced performance and acute effects such as migraine and epileptic seizures. EN 12464-1:2021 on workplace lighting has a clause (5.8) on flicker and stroboscopic effects.
- Neighbours: fluctuations spread, attenuated, to the other users on the same part of the network; whoever causes them gets the complaints and the operator's requests.
- Equipment: large fluctuations can upset voltage-sensitive electronics and processes.
These costs are worth estimating before choosing a fix: the method is in our guide to the cost of power quality problems.
How do you find the source of flicker?
By measuring Pst and Plt at the point of supply and on the suspect loads over the same period, and comparing them with the loads' duty cycles.
- Check that it really is network flicker. If only some lamps on a circuit flicker, the cause may be the lamp driver or a dimmer, which IEC TR 61547-1 lists among the sources of light modulation.
- Measure at the point of supply with an IEC 61000-4-15 flickermeter for at least a week, covering shifts, shutdowns and complete load cycles.
- Measure voltage and current on the suspect feeders: the voltage shows the effect, the current shows who causes it.
- Correlate Pst with furnace cycles, welding sequences and compressor starts.
- Separate network and plant: high Pst at the point of supply with the plant stopped points to an external source; if it rises with your loads and is higher downstream, the source is internal.
- Calculate d using the short-circuit power at the point of supply, which the operator provides, and at the internal busbars.
How to plan the campaign and read the results is covered in our guide to power quality analysis; for support there is Poweremp's Power Quality audit, which starts from the causes of the disturbances and ends with mitigation strategies.
From the field
A high Pst on its own does not tell you who is causing it: it is a 10-minute statistic. You find the source when, in the same intervals, the current of one feeder varies with the same rhythm as the voltage, so always record the currents as well.
Caution
Installing instruments in live switchboards is electrical work: it must be done by skilled or instructed persons under CEI 11-27 and EN 50110-1, using instruments of a measurement category suited to the point of installation.
Example: how much does a motor start change the voltage?
A hypothetical case: an MV user with 630 kW of available power and a network short-circuit power of 30 MVA, the value Annex F of CEI 0-16 gives for that power. The 630 kVA transformer with 6% short-circuit voltage has, on its own, Ssc = 0.63 / 0.06 = 10.5 MVA; at the LV busbars the impedances add up: Ssc = 1 / (1/30 + 1/10.5) ≈ 7.8 MVA. A compressor with a 100 A, 400 V motor starts several times an hour; with the starting currents given in ABB's softstarter handbook and d ≈ ΔS / Ssc:
| Starting method | Current | ΔS | d at LV busbars | d at point of supply |
|---|---|---|---|---|
| Direct-on-line | 7 × In = 700 A | 485 kVA | 6.2% | 1.6% |
| Softstarter, current limit 3.5 × In | 350 A | 243 kVA | 3.1% | 0.8% |
| Variable-speed drive | about In | up to 69 kVA | 0.9% | 0.2% |
Lights on the same LV busbars see a step almost four times larger than the one reaching the neighbours on the MV network: the problem is first of all internal, and even a direct-on-line start stays below the 5% of Annex F at the point of supply. With steps repeating several times an hour, Pst must be calculated with the IEC TR 61000-3-7 method or measured.
How can flicker be reduced?
By reducing the size or the frequency of the load changes, or by increasing the short-circuit power seen by the load; start with the load, which costs less.
| Cost | Measure | What it fixes and limits |
|---|---|---|
| Almost nil | Slower load ramps, staggered starts, fewer on/off cycles of compressors. | Fewer and smaller steps; depends on the process. |
| Low | Lamps with good immunity; lighting on circuits not shared with the disturbing load. | Removes the symptom inside the plant; changes nothing for the neighbours. |
| Low–medium | Softstarter (typical current limit 3–5 × In) or variable-speed drive on frequently started motors. | Cuts the inrush; drives add harmonics. |
| Medium | Fast reactive power compensation on welders and pulsed loads (thyristor-switched power factor correction). | Reduces the X·ΔQ term; must be as fast as the load. |
| Medium–high | Dedicated transformer or feeder for the disturbing load. | Separates the shared internal impedance; nothing changes at the point of supply. |
| High | SVC or STATCOM dynamic compensators, typical for arc furnaces. | Compensate the fluctuating reactive power in real time; one manufacturer reports flicker reduced up to seven times on an arc furnace. |
| High | Connection at a stronger node or at a higher voltage level. | Reduces d for everyone; connection solutions other than the operator's are assessed at the user's request, on economic terms set by ARERA. |
For a new load, such as a furnace or a welding line, d and Pst should be estimated before buying it and before applying for the connection.
What does flicker cost and how much is it worth spending?
The costs of flicker are less visible than those of a stoppage: fatigue and loss of concentration for the people working under the light, complaints from neighbours, and requests from the operator, which sets the permitted disturbance at connection. They must be weighed against the cost of the fixes, which ranges from almost nothing to major investment.
CEI 0-16 takes the same view: it provides for network development when the user's needs cannot be met effectively by changing the user's own installation, with the aim of keeping overall costs down. EN 50160, on the other hand, leaves the sharing of complaint-handling and mitigation costs between the parties outside its scope. For a repeatable way to compare costs and benefits, see our guide to the cost of power quality problems.
Frequently asked questions
Why do LED lights flicker even when the voltage is stable?
Because the flicker can originate in the lamp itself: IEC TR 61547-1 mentions the driver, the light source technology and dimmers. If the voltage Pst is low, the problem lies in the luminaire.
Does any power analyser measure flicker?
No: you need an IEC 61000-4-15 flickermeter, which is included in IEC 61000-4-30 Class A analysers; with other instruments, check.
Can the distributor ask me to reduce flicker?
Yes: under CEI 0-16 and CEI 0-21 it sets the maximum disturbance you may inject, and EN 50160 does not apply to installations that break the connection rules.
What is the difference between flicker and a voltage dip?
Flicker comes from small, repeated changes; a dip is a drop below 90% of the voltage lasting from 10 ms to 1 minute.
Sources and standards
- IEC 61000-4-15:2010 (with ISH1:2017); IEC 61000-4-30:2025.
- IEC 61000-3-3:2013 + AMD1:2017 + AMD2:2021, IEC 61000-3-11:2017, IEC 61000-2-2, IEC 61000-2-12; limits and reference impedance as reported by Yokogawa Test & Measurement.
- IEC TR 61000-3-7:2008; planning levels as reported in Halpin et al., CIRED 2009, paper 0755.
- IEC TR 61547-1:2020, light flickermeter.
- EN 50160:2022 + A1:2025 (CEI EN 50160); European Copper Institute, Application Note Cu0147 (2013).
- CEI 0-16:2022-03 (clauses 4.1.2, 9.1, 13.1.1, Annexes F and N) and CEI 0-21:2022-03 (clauses 4.1.2, 5.3, Annex B); CEI 11-27; EN 50110-1.
- Regulation (EU) 2019/2020, as amended by Regulation (EU) 2021/341; EN 12464-1:2021, clause 5.8.
- CCOHS, Light Flicker; Berhane and Kamalinia, CIGRE USNC 2019.
- Manufacturer documentation: Power Monitors Inc. (2014), Fluke and Sonel on flicker; ABB, Softstarter Handbook; Hitachi Energy, STATCOM for an arc furnace.