In short
- Power quality covers both the voltage the grid supplies and the current the loads draw: distributor, user and equipment manufacturers share the responsibility.
- Standards separate continuous phenomena (frequency, voltage variations, flicker, unbalance, harmonics) from events (dips, interruptions, overvoltages, transients).
- Dips and interruptions mostly come from the grid; harmonics, flicker and unbalance often originate in the plant itself or in neighbouring ones.
- Every symptom has typical disturbances, but only measurements matched against the time of the problems prove the cause.
- A disturbance costs as much as the downtime, scrap and failures it causes: that is what sets the budget for fixing it.
What is power quality?
Power quality is the set of characteristics of voltage, current and frequency at a given point of an electrical system, assessed against reference technical parameters: this is, in essence, the definition in the International Electrotechnical Vocabulary (IEV 617-01-05). The reference is a 50 Hz sinusoidal voltage of constant amplitude, with three equal phases displaced by 120°: any departure from it is a disturbance.
Voltage quality is what the grid delivers and depends on the distributor and on other users. Current quality is what the loads draw: distorted, unbalanced or fluctuating currents flowing through the impedance of transformers and lines turn into voltage disturbances for everyone connected at the same point.
EN 50160 splits voltage disturbances into continuous phenomena, always present and assessed with averages and percentiles over a week, and events, sudden and caused by faults or external causes, which are counted one by one. IEC 61000-4-30 (edition 4.0, October 2025) sets the measurement methods for frequency, magnitude, flicker, dips, swells, interruptions, transients, unbalance, harmonics, interharmonics, rapid voltage changes and mains signalling voltages, plus the main current quantities.
Who is responsible for power quality, the grid or the user?
Both, together with equipment manufacturers. This is the principle of electromagnetic compatibility: the disturbance level on the network must stay below the immunity of the equipment, and those connected must not push it beyond what is planned.
- Distributor: the voltage at the supply terminals must comply with EN 50160, which ARERA's distribution quality code (TIQD) makes binding for Italian MV and LV networks, with separate rules for interruptions, frequency and LV voltage magnitude (207–253 V, with no statistical allowance).
- User: the Italian connection rules (CEI 0-21 at LV, CEI 0-16 at MV and HV) forbid disturbing loads from degrading network quality; the operator states the maximum disturbances a user may inject (slow and rapid voltage variations, flicker, harmonics, unbalance), taking other users into account.
- Manufacturers: the EMC Directive 2014/30/EU (transposed in Italy by Legislative Decree 194/2007 as amended by Legislative Decree 80/2016) requires limited emissions and immunity adequate for the intended use.
Inside the plant IEC 61000-2-4 (2024 edition) applies instead, with compatibility levels that reach 150 kHz on low-voltage networks. On dips ARERA asks users to make their installations immune up to class 3 and the distributor to reduce the more severe ones. If a disturbance is already present at the point of supply with the plant shut down, it comes from the grid; if it grows when certain machines run, it originates inside: the method is in the EN 50160 guide.
What electrical disturbances are there and where do they come from?
"Origin" shows where the disturbance usually arises, not who is responsible for it; the name links to the dedicated guide.
| Disturbance | What it is | Typical causes | Typical effects | Origin |
|---|---|---|---|---|
| Frequency variations (below) | Frequency other than 50 Hz | Imbalance between generation and demand; isolated networks, generator sets | Motor speed; disconnection of generation | Grid or generator set |
| Slow voltage variations | Slow changes in RMS voltage, assessed on 10-minute averages | Heavily loaded or long networks, solar PV, voltage drop in internal feeders | Motors drawing more current, PV inverters disconnecting | Both |
| Rapid voltage changes (below) | A step in RMS voltage between two steady levels, within the dip and swell thresholds | Motor starts, load switching, network switching | Changes in light output; if repeated, flicker | Mostly the plant |
| Flicker | Repeated voltage fluctuations that make lighting unsteady (Pst, Plt) | Arc furnaces, welders, frequently started motors, crushers | Visible flicker, complaints | A plant, yours or a neighbour's |
| Voltage dips | Voltage below 90% for 10 ms – 1 min | Short circuits on the HV and MV network; internal motor starts and faults | Contactors dropping out, drives tripping, PLCs rebooting | Mostly the grid |
| Interruptions | Voltage below 5% on all phases; short up to 3 min | Faults cleared by protection, auto-reclosing, planned work | Complete stoppage and restarts | Grid or internal protection |
| Swells | Voltage above 110% for 10 ms – 1 min | Switching, disconnection of large loads, faults; broken neutral | Possible failures of power supplies and single-phase equipment | Both |
| Transients | Impulsive or oscillatory overvoltages lasting from under 1 µs to a few ms | Lightning, switching of breakers and capacitors | Damaged electronics, RCD trips, drive trips | Both |
| Unbalance | Phases differing in magnitude or angle; measured as negative- to positive-sequence ratio | Poorly distributed single-phase loads, resistance welders, induction furnaces | Hotter motors: current unbalance is 6–10 times the voltage unbalance | Both |
| Harmonics | Components at integer multiples of 50 Hz | Drives, rectifiers, electronic power supplies, UPSs, LEDs | Hot transformers and neutrals, failed capacitors, thermal trips | Mostly the plant |
| Interharmonics (below) | Components at frequencies that are not integer multiples of 50 Hz | Frequency converters, induction and arc furnaces | Flicker, interference with network signalling | Mostly the plant |
| Signalling and 2–150 kHz emissions (below) | Operator signals superimposed on the voltage; emissions from power electronics | Smart meter communication; drives, power supplies, lamps | Interference with meter reading and other equipment | Both |
Frequency, slow and rapid variations, interharmonics, signalling: what to know?
Frequency variations
In continental Europe frequency depends on the balance between generation and demand across the whole synchronous system. Regulation (EU) 2017/1485 sets a standard frequency range of ±50 mHz and a maximum steady-state deviation of 200 mHz; EN 50160 allows 49.5–50.5 Hz for 99.5% of the year and 47–52 Hz at all times (wider ranges on isolated networks). For grid-connected users frequency is rarely a problem: motor synchronous speed, n = 60·f/p (p pole pairs), changes by at most 0.1% within the standard range. It matters in island operation on a generator set, and for generating plants, which CEI 0-21 disconnects at LV below 47.5 Hz and above 51.5 Hz.
Slow voltage variations
They last minutes or hours and are assessed on 10-minute averages: EN 50160 requires 95% of the week's LV values within ±10%, while ARERA imposes 207–253 V with no allowance. Causes include heavily loaded or long networks, solar PV in sunny hours, voltage drop in internal feeders and the MV/LV transformer tap. Equipment is normally designed for ±10%: below that, a motor delivering the same power draws more current and runs hotter; above it, LV solar plants disconnect when the 10-minute moving average exceeds 1.10 Vn (protection 59.S1 of CEI 0-21).
Rapid voltage changes
An RVC is a quick transition of the RMS voltage from one steady level to another without crossing the dip or swell thresholds; if it crosses them, the event is a dip or a swell. EN 50160 gives only indicative values: at LV generally up to 5% of nominal voltage, sometimes up to 10%. The typical case is the direct-on-line start of a motor that is large compared with the available short-circuit power; repeated, RVCs cause flicker.
Interharmonics
These are components at frequencies that are not integer multiples of 50 Hz, produced by static frequency converters and cycloconverters, drives with a poorly filtered DC link, induction and arc furnaces, and welders. Even at low levels they can cause flicker and interfere with ripple control systems. EN 50160 sets no values yet; compatibility levels and the measurement method are in IEC 61000-2-4:2024 and IEC 61000-4-7.
Signalling voltages and 2–150 kHz emissions
Distributors may send signals over the grid: ripple control between 110 Hz and 3 kHz, power line carrier between 3 and 148.5 kHz; under EN 50160 their 3-second mean must stay below a frequency-dependent curve for 99% of the day. EN 50065-1 reserves the 3–95 kHz band for distributors, used for example by e-distribuzione's second-generation smart meters, and CEI 0-21 requires user installations not to disturb remote meter management. Unintentional emissions from drives, power supplies and lamps fall in the same range: CENELEC (CLC/TR 50627:2015) collected documented interference cases from several European countries.
From symptom to disturbance: what to check first?
The first check confirms or rules out the suspicion before money is spent on solutions.
| Symptom | Likely disturbance | First check |
|---|---|---|
| Lines stopped, contactors dropped out, no breaker open | Voltage dip or short interruption | Time of the stoppage against events recorded at the point of supply and the distributor's data |
| Drives tripping on DC-link undervoltage | Voltage dip | Drive fault log aligned with voltage events |
| Drives tripping on DC-link overvoltage, motor braking ruled out | Switching transients, including power factor correction capacitors | Coincidence with capacitor steps switching in or with network switching; line reactors fitted or not |
| RCDs or breakers tripping with no fault | Drive leakage, transients, harmonics, inrush | Trip times against continuous measurements: see nuisance tripping |
| Hot transformers, cables or neutral; thermal trips at unchanged load | Harmonics | RMS current, current THD and neutral current per feeder |
| Swollen or overheating capacitors, PFC fuses blowing | Harmonic resonance | Voltage THD with steps in and out; type of power factor correction |
| Flickering lights | Flicker, rapid voltage changes, interharmonics | Pst and Plt with an IEC 61000-4-15 flickermeter; coincidence with welders, furnaces, motor starts |
| Hot motors, motor protection tripping | Unbalance, low voltage, harmonics | Voltage and current unbalance; terminal voltage under load |
| Electronics failing after storms or switching | Transients | Presence and condition of surge protective devices (SPDs); a transient recorder |
| Many single-phase devices failing together, very different phase voltages | Broken or loose neutral | Immediate check of the neutral by skilled or instructed persons |
| Solar PV disconnecting in sunny hours | High voltage | 10-minute averages at the point of supply against 1.10 Vn |
From the field
The most useful data does not come from the instrument but from the problem log: date and time of every stoppage, trip or alarm, to the minute. Without times, even weeks of measurements only show that disturbances exist, not which one stopped the machine. Before measuring, align the clocks of PLCs, drives and recorders.
How do you start a power quality diagnosis?
With a recorded measurement campaign, long enough and matched against the time of the problems: disturbances are intermittent and a spot check with a multimeter almost never catches them. The full method is in the power quality analysis guide; the essential steps:
- Collect the symptoms: which machines, when, with which alarms.
- Measure at the point of supply and at the same time on suspect feeders, with synchronised clocks: comparing points separates the grid from the plant.
- Measure for long enough: at least one full week for EN 50160 (1,008 ten-minute averages); rare events such as dips need months or continuous monitoring.
- Choose the instrument: IEC 61000-4-30 Class A when results must stand up in a dispute, Class S for surveys and diagnosis; flicker needs an IEC 61000-4-15 flickermeter, fast transients a suitable recorder.
- Correlate events with stoppages, looking at the current at the start of each event: if it jumps, the cause is often internal.
EN 50160 judges the voltage at the point of supply and tells you whether to involve the distributor; it does not tell you whether your machines will cope, because it is not an immunity standard.
For continuous monitoring, ALADIN samples voltages and currents at 16 kHz, records every voltage event with time, duration and residual voltage plus the current drawn just before it, and calculates harmonics, unbalance and the 10-minute values for EN 50160; flicker and fast transients need dedicated instruments. Poweremp's power quality audit combines a site survey, a measurement campaign, root-cause analysis and verification of the fixes over time.
Caution
Installing instruments in live switchboards, checking a neutral or working on protection and power factor correction is electrical work: it is for skilled or instructed persons under EN 50110-1 (CEI 11-27 in Italy), with instruments of a measurement category suited to the installation point.
How much do power quality problems cost?
A disturbance costs what it causes: stoppages and restarts, scrap, failures and early ageing of capacitors, motors and electronics, extra losses due to harmonics, reactive energy charges, hours spent chasing faults that do not exist. For disturbances that stop production, the expected annual cost is the number of damaging events per year times the average cost of one event: a solution pays off when its annualised cost stays below the avoided cost. The method is in the guide to the cost of power quality.
Frequently asked questions
Who is responsible for power quality, the distributor or the user?
The distributor is responsible for the voltage at the point of supply (EN 50160 and ARERA rules); the user for the disturbances its loads inject into the grid, within the limits of the connection rules, and for the immunity of its own installation; manufacturers for the emissions and immunity of their equipment.
What is the difference between power quality and energy efficiency?
Power quality concerns the shape of voltage and current, and therefore reliability; efficiency concerns how much energy production needs. They overlap on harmonics and reactive energy, which raise losses and costs, and are often measured with the same instruments. For consumption see energy monitoring; to prove savings, the IPMVP protocol.
How long should a power quality measurement last?
At least one full week, including working days and days off. For dips and interruptions, which depend on random faults, you need months or continuous monitoring.
Is an ordinary power analyser enough?
For power and energy, yes. For power quality you need the IEC 61000-4-30 methods: events detected on RMS values refreshed every half cycle, 10-minute averages, flagging of disturbed intervals; for flicker, an IEC 61000-4-15 flickermeter.
Does a UPS solve power quality problems?
It protects only the loads it feeds, mainly against dips and interruptions. It does not reduce the harmonics, unbalance or flicker produced by the rest of the plant, nor remove their cause: identify the disturbance first, then decide where to protect.
Sources and standards
- IEC 61000-4-30:2025 Ed. 4.0; IEC 61000-4-7; IEC 61000-4-15; IEC 61000-2-4:2024 Ed. 3.0.
- EN 50160:2022 + A1:2025 (CEI EN 50160); European Copper Institute, Application Note Cu0147, Standard EN 50160 (2013).
- IEC 60050-617, entry 617-01-05; M.H.J. Bollen, What is power quality?, Electric Power Systems Research 66 (2003).
- Directive 2014/30/EU, Annex I; Italian Legislative Decree 194/2007 as amended by Legislative Decree 80/2016.
- CEI 0-21:2022-03 with amendments up to V3:2025-10, consolidated version (Tables 2 and 13, clause 9, in Italian); CEI 0-16 (consolidated 12-2025); EN 50065-1.
- Regulation (EU) 2017/1485, Annex III.
- ARERA, TIQD 2024-2027 (resolution 617/2023/R/eel as amended).
- e-distribuzione, Open Meter guide (in Italian); CENELEC CLC/TR 50627:2015.
- IEC 60034-26:2026 Ed. 2.0, effects of unbalanced voltages on cage induction motors.
- EPRI, Guidelines for Flicker Limits at Industrial Customers (2009).
- G.V. Fantozzi, S&C Electric, capacitor switching and nuisance tripping of drives (1995); ABB ACS580 firmware manual (fault 3210).
- M.B. Marz, American Transmission Company, Interharmonics.
- EN 50110-1; CEI 11-27.