In short

  • Two families of cost: events (dips, interruptions, overvoltages) that stop the process, and continuous disturbances (harmonics, unbalance, low power factor) that add losses and wear.
  • A stoppage is costed up to the first good part: lost output, scrap, restart, damage, penalties.
  • Annual cost of dips = Σ events per class × share that stops the process × cost of one stoppage.
  • Published surveys give dated orders of magnitude: your own figure comes from measurements and production data.

What do power quality problems cost a company?

There is no figure that fits everyone: it depends on how many disturbances arrive, how sensitive the process is and what an hour of production is worth. Two families of cost add up:

  • Event costs. Voltage dips, interruptions, temporary overvoltages and transients are rare and random, but each one can stop a line, ruin work in progress or damage equipment.
  • Continuous costs. Harmonics, unbalance, low power factor and high voltage cost little per hour, but they cost it all year round.

Annual cost = Σ (stoppages × cost of one stoppage) + kWh of extra losses × price + early replacements + reactive charges

Surveys suggest events weigh the most, but they cannot tell you what your own plant spends. For an overview of all disturbances, see the guide to power quality and electrical disturbances.

What are the cost items of an electrical disturbance?

List them all, then estimate the ones that matter in your case.

ItemTypeHow to estimate it
Output lost during the stop and the restartEventhours lost × hourly margin
Scrap and reworkEventparts or batches lost × cost
Idle staff, overtime to catch upEventhours × hourly cost, counted once
Missed deliveries, penalties, express shippingEventcontracts and history
Equipment damageEventfailure and maintenance records
Data loss, reconfiguring PLCs and systemsEventautomation and IT hours
Losses in transformers, cables and motorsContinuouskWh × price
Shorter life of capacitors, motors, insulation, electronicsContinuousearly replacements
Derating and oversizingContinuousunusable capacity, extra investment
Reactive energy chargesContinuouselectricity bill
Higher consumption due to high voltageContinuousbefore-and-after measurements

Events: dips and interruptions, overvoltages and transients. Continuous costs: harmonics, unbalance, low power factor, high voltage.

How do you calculate the cost of a machine stoppage caused by a voltage dip?

By counting everything from the moment the line stops to the first good part: the dip lasts tenths of a second, resetting and setting up can take hours. In EPRI's 2001 survey of US businesses, a one-second outage caused 8.9 minutes of downtime on average.

Cstop = T × M + S + R + D + P − E

  • T: hours from the stop to the first good part.
  • M: hourly contribution margin (revenue minus variable costs) if the lost output cannot be made up; if it can, the hourly cost of making it up (overtime, extra shifts).
  • S: scrap and rework. R: restart (maintenance call-out, test parts, purging).
  • D: expected damage: cost of a failure × probability that a stoppage causes it.
  • P: penalties and express shipping. E: materials and energy not used, unless already in the margin.

Count idle staff once: if the output is lost, they are already in the lost margin; if it is made up, they show up as overtime.

Example with hypothetical data. A line running at full capacity, so lost output cannot be recovered, with a margin of €2,000/h; 1 hour to the first good part; €800 of work in progress scrapped; €300 of restart costs; one stoppage in ten breaks a €4,000 tool, i.e. €400 of expected damage. Cstop = 2,000 + 800 + 300 + 400 = €3,500.

From the field

Downtime remembered from memory is almost always shorter than the real thing: take it from the logs, from the first PLC or drive alarm to the first conforming part. And check the clocks: a PLC a few minutes out from the instrument assigns the stoppage to the wrong event, or to none. Synchronise everything to the same network time (NTP).

How do you calculate the annual cost of voltage dips?

For each severity class, multiply dips per year by the share that stops the process and by the cost of one stoppage, then add up. This is the approach of IEEE 1346-1998, now withdrawn: expected dips compared with process sensitivity, alternatives assessed in technical and financial terms.

  1. Count events by class of residual voltage and duration (EN 50160 table in the guide to voltage dips), measuring at the point of supply; MV customers receive from the distributor each year, by 30 September, the dips recorded on the busbar that feeds them. As a reference, ARERA reports a 2024 national average of 3.86 severe dips of MV origin per MV customer, from under 1 to over 14 depending on the area.
  2. Estimate the share that stops the process: for each class, correlated stoppages divided by events.
  3. Work out the cost of one stoppage per line.
  4. Add up: Σ events in the class × share that stops × cost of the stoppage.
  5. Compare solutions: stoppages avoided, investment, annual costs, payback.

Example with hypothetical data. Twelve months of measurement on the line from the previous example:

Dip classEventsStoppagesShare that stops
Shallow: residual voltage 80–90%1000%
Medium: residual 40–80%, up to 200 ms6350%
Deep or long33100%

Expected annual cost: 6 stoppages × €3,500 = €21,000. Two solutions, with hypothetical costs:

  • A: kinetic buffering and automatic restart on the drives, buffer modules or UPS on PLCs, 24 V supplies and coils, €12,000. Removes the 3 stoppages from medium dips: €10,500 a year, payback 12,000 / 10,500 ≈ 1.1 years.
  • B: static UPS for the whole line, €90,000 plus €2,500 a year for batteries, maintenance and losses. Removes all 6 stoppages: 21,000 − 2,500 = €18,500 a year, payback 90,000 / 18,500 ≈ 4.9 years.

On its own B also pays back, but compared with A the extra €78,000 avoids 3 stoppages: 10,500 − 2,500 = €8,000 a year, an incremental payback of almost 10 years. A wins; B is justified by costlier stoppages, more events or the need to cover interruptions as well. Dip counts vary a lot from year to year: also test a bad year, for example with twice the events.

€80k €40k 0 −€40k −€80k 0 1 2 3 4 5 6 7 8 Years after the investment A pays back: 1.1 years B pays back: 4.9 years A: €12,000 B: €90,000
Cumulative, undiscounted cash flow of the example with hypothetical data: A avoids €10,500 a year of stoppages, B €18,500 net. B pays back, but stays below A for almost 10 years.

Caution

Enabling automatic restart on drives or delaying undervoltage releases changes how the machine behaves for safety: EN 60204-1 requires hazardous automatic restarts to be prevented, so every change belongs in the risk assessment. Installing instruments and working in switchboards is for skilled or instructed persons under CEI 11-27 and EN 50110-1.

What do harmonic losses cost?

Harmonics raise the RMS current and therefore the I²R losses; in transformers they raise the winding eddy-current losses far more. Both are calculated from the measured current spectrum.

  • Cables: Irms² = I1² · (1 + THDi²), so losses grow by the factor (1 + THDi²): +9% at 30% THDi. This is an underestimate: resistance rises with frequency through skin effect, and triplen harmonics add up in the neutral.
  • Transformers (IEEE C57.110): the load losses in the test report split into I²R losses, calculated from the DC resistances, and stray losses. Winding eddy-current losses grow with Σ Ih²·h², other stray losses with Σ Ih²·h0.8, with Ih relative to the fundamental. Ask the manufacturer for the split.
  • Load: losses follow the square of the current, so use the RMS value of the load over the year, not its average.

Example with hypothetical data. A transformer with 10,000 W of load losses at rated current: 7,000 W I²R, 1,000 W winding eddy current, 2,000 W other stray losses. Current with 5th at 25%, 7th at 12%, 11th at 7% and 13th at 5% (THDi ≈ 29%); fundamental at 60% of rated (0.6² = 0.36) for 4,000 hours a year.

LossesCalculationWithout harmonicsWith harmonics
I²R7,000 × 0.36 × 1.0842,520 W2,732 W
Winding eddy current1,000 × 0.36 × 4.284360 W1,542 W
Other stray2,000 × 0.36 × 1.348720 W970 W
Total3,600 W5,245 W

The factors: Σ Ih² = 1 + 0.25² + 0.12² + 0.07² + 0.05² = 1.084; Σ Ih²·h² = 1 + 0.0625·25 + 0.0144·49 + 0.0049·121 + 0.0025·169 = 4.284. The difference is about 1.64 kW (+46%): 6,580 kWh a year, about €1,180 at a hypothetical €0.18/kWh. A cable dissipating 2,000 W at the same fundamental current adds 2,000 × 0.084 ≈ 170 W, about 670 kWh and €120 a year. Around €1,300 a year in all: a filter must be weighed against this saving, net of its own losses, and against the thermal benefits.

The extra losses turn into temperature. Under IEC 60076-7, in oil-immersed transformers with non-thermally upgraded paper, insulation ageing doubles for every 6 K rise at the hot spot. IEEE C57.110 also gives the method for derating a transformer for a given spectrum.

Unbalance, power factor and high voltage: what other hidden costs are there?

  • Voltage unbalance: the negative-sequence component drives currents in motors that produce heat but no torque and, beyond certain levels, forces derating. See the guide to voltage unbalance.
  • Low power factor: reactive energy charges (in 2026, 0.377 c€/kvarh on MV and 1.088 c€/kvarh on LV above 16.5 kW in Italy), plus losses upstream of the correction point and transformer capacity taken up. See reactive energy and power factor correction.
  • Persistently high voltage: an unregulated resistive load draws about 10% more with 5% more voltage (1.05² ≈ 1.10); with a thermostat or drive it uses almost the same energy. Savings from lowering the voltage must be measured: see the guides to overvoltages and to IPMVP savings verification.

Who pays for the damage: the distributor, the user or the insurer?

Almost always the user. ARERA's automatic compensation covers interruptions, not dips: an MV customer is paid per kW interrupted only when long and short interruptions exceed the annual standard and the installation meets the technical requirements. ARERA expects the user to make the installation immune to dips up to class 3 and the distributor to reduce the more severe ones; details in the guide to voltage dips.

  • Distributor: further damages can still be claimed in court, by proving the event and its link to the damage.
  • Other users: a disturbance coming from a neighbouring installation should be reported to the distributor, with measurements.
  • Machine suppliers: specify dip ride-through in the purchase specification; a machine compliant with the generic standard IEC 61000-6-2 may stop for a dip to 40% lasting 200 ms.
  • Insurance: many policies include cover for electrical damage to machinery and installations, with excesses, limits and exclusions; lost profit from downtime needs separate business interruption cover.

In every case measured evidence counts: time, duration and residual voltage of each event, current before and during, compared with the stoppages and with the distributor's data.

What do surveys say about the cost of power quality?

They give dated orders of magnitude: they show where costs concentrate, not what they cost you.

SurveySampleResultLimits
EPRI (Primen study for CEIDS), June 2001, USA985 establishments in three sectors: digital economy, process and manufacturing industry, essential servicesThose sectors: $45.7 billion a year from outages and $6.7 billion from other disturbances; all businesses: $104–164 billion and $15–24 billionCosts estimated by respondents for hypothetical scenarios; extrapolation to all businesses assumes other sectors bear 25–50% of the cost
Leonardo Power Quality Initiative, European Copper Institute, 2008 report62 interviews in 8 European countries, 2005–2006Over €150 billion a year in the EU-25 for the sectors covered, over 90% of it in industrySmall sample, extrapolated to the economy by turnover
AEEG (now ARERA), 2006–2007, reported by CEER in 201050 MV industrial sites with a power quality recorderDips and transient interruptions: €252–296 million a year of direct costs in the observed sensitive sectors, about €316 million estimated for the other sensitive sectors, about €197 million a year of investment in protection (2006 euros)Sample not stratified; unobserved sectors estimated by experts

In the European report, dips and short interruptions together are the largest share. For a one-second outage, in the EPRI survey, the largest item was equipment damage: $554 out of an average net cost of $1,477. And part of the cost is prevention, such as the investment in protection estimated by the Italian survey.

How do you present the case to management?

With one page and four answers:

  1. What it costs today: expected annual cost in an average year and in a bad one, with the assumptions stated.
  2. What the solution costs: investment, maintenance, its own losses, battery or capacitor replacement.
  3. When it pays back: payback period and equivalent annual cost I × r / (1 − (1 + r)−n). For B, at 8% over 10 years: 90,000 × 0.149 ≈ €13,400 a year, plus €2,500 of running costs, against €21,000 of avoided stoppages.
  4. What risk remains: events not covered, such as interruptions longer than the UPS autonomy.

Rank measures by cost per stoppage avoided, compare them incrementally and check the result by counting events and stoppages again.

Without continuous measurement the calculation stays an estimate: a week of measurement may record no dips at all, while the share that stops the process needs months of events correlated with stoppages. How to set it up is explained in the guides to power quality analysis and energy monitoring. ALADIN, for example, records the time, duration and residual voltage of each event and the current drawn just before it, which helps separate network dips from internal motor starts. Poweremp's energy consulting ranks measures by impact, cost and return.

Frequently asked questions

What does a machine stoppage caused by a voltage dip cost?

It depends on the time to the first good part and the value of the lost output. The dip lasts a fraction of a second; the cost is in the restart: €3,500 per stoppage in this guide's hypothetical example.

Does the distributor pay for stoppages caused by voltage dips?

No, there is no automatic compensation for dips in Italy. Further damages can be claimed in court, with measurements proving the event and its link to the damage.

Do harmonics increase the electricity bill?

Yes, to a limited extent: losses downstream of the meter are paid-for kWh, about 6,600 kWh a year in the example. Overheating and ageing also count.

How long do you need to measure to estimate the costs?

For harmonics, unbalance and power factor, at least one representative week; for dips, months, ideally a year, or the distributor's data for MV customers.

Sources and standards